New Fence Installation in Everett, WA

A new fence is a big job. The company should measure, check your property line, pull the permit if one is needed, and set posts deep enough to stay straight.

  • Cedar privacy fence. Cedar boards handle Western Washington rain better than most wood, when posts are set to drain.
  • Pressure-treated posts with cedar boards. Local trade advice is to use ground-contact treated posts because wet soil rots buried cedar.
  • Vinyl fence. It does not rot, which fits the October to April wet season.
  • Aluminum or open-style front yard fence. The front setback is limited to 42 inches, or 6 ft only if the fence is 70 percent see-through.
  • Chain link fence. A low-cost choice for backyards and pets, but it cannot be used for the taller front-yard option and is banned in some zones.

Cedar posts set in wet soil can rot in 15 to 20 years. Treated posts with cedar boards above ground often last longer.

Get matched with a Everett fence company

Free. One company calls you, not ten.

By sending this, you agree we may share your details with one local fence company so they can contact you about your project. We don't sell your details to anyone else. Privacy

Typical prices in Everett

JobTypical rangeBasis
Cedar fence, per linear foot installed (Seattle area)$25-$50regional 2025
Wood fence, per linear foot installed (Pacific Northwest planning range)$32-$65regional 2026
Typical 150 ft wood fence job (Pacific Northwest)$4,800-$9,750regional 2026
Cedar fence, typical 200 ft job$3,700-$9,300national 2025

Ranges, not quotes. Your price depends on the job.

Everett rules that apply

The city's fence handout says a fence 7 feet tall or less on private property does not need a permit. It still must meet the city's height, material and see-through rules. A fence over 7 feet, where allowed, or any fence in the public right-of-way needs a Public Works permit. Permit Services at 3200 Cedar Street handles questions.

Questions

Can I put a fence on a retaining wall?

A wall over 4 feet needs a permit and an engineer. Whether the fence on top counts toward wall height was not confirmed, so ask Everett Planning before you build.